In DROTEC We manufacture and design each of the parts that make up our pumps, once machined they go to the assembly sector and from the latter they leave for our test bench. In the operation test we guarantee correct compliance with the service requested by the client, comparing the performance of the pump with the characteristic curves.
This bench has a frequency converter, energy meter, pressure sensors, control software and other equipment that facilitates each of the tests. In turn, to test the different manufactured models, we have 2, 3, 4, 6, 8 and 10” pipes according to ASME B36.10 with flanged joints according to ANSI B16.5 series 150lbs.
All equipment is tested before being shipped. The test is recorded and supplied, along with other documents, with the pumping equipment, these are:
✔️Certified exploded view: Cutaway view that indicates the parts of the equipment.
✔️ Dimensional plan: Necessary to plan the installation.
Each device has an assigned Serial Number, this is engraved on the pump plate. We have a complete traceability record so that, if the serial number is indicated when requesting replacement parts, the corresponding spare part will be known unequivocally.